VĨNH LONG — 2007 · Major Tragedy

The Cần Thơ Bridge Collapse

ClosedSources: ALast updated: 14 October 2026

At about 8 am on 26 September 2007, a 90-metre approach section of the Cần Thơ Bridge, then under construction over the Hậu River in the Mekong Delta, collapsed from a height of more than 30 metres on the Vĩnh Long side. Around 250 engineers and workers were on or beneath the span at the time. According to the Vietnamese government, 54 people were killed and 80 seriously injured. An eight-month official inquiry identified the uneven sinking of the foundation of a temporary pier as the main cause. Police opened a criminal investigation into breaches of construction regulations. The project, led by a Japanese consortium, was completed late and the bridge opened to traffic in April 2010.

Date
2007
Place
Bình Minh, Vĩnh Long, Vietnam, Vĩnh Long, VN
Category
Major Tragedy
Case Status
Closed
Coordinates
10.0425, 105.7955 ↗

Timeline of Events

  1. 26 September 2007, 8 amThe bridge's approach section collapsed.
  2. 2007A criminal investigation into construction violations was opened.
  1. July 2008The inquiry named the sinking temporary foundation as the main cause.
  2. April 2010The bridge opened to traffic.

Sources

Source grade A: several independent sources, at least one an official record or reference work. If you spot a mistake or something missing, report it with "Suggest a correction" in the app.

Related Cases

More cases from the 2000s

See all ›

Categories

Collections

🕯️ This record was prepared with respect, in memory of those who lost their lives.